Fire Suppression Systems in Iraq
Gas, foam, powder, water-based and wet chemical suppression systems designed, supplied, installed and maintained for data centres, plants, tank farms, kitchens, warehouses and buildings across Iraq.
Automatic protection that acts before people arrive
Suppression systems protect the places where a fire would cost the most: control rooms, server rooms, generator halls, fuel tanks and kitchens. We choose the agent that suits the hazard, run the design calculation and give you room integrity, discharge time and cylinder data in writing.
Every system is linked to detection and alarm, with manual release, abort switches and warning signs, and every system comes with a maintenance plan.



Systems we supply and install
Clean agent gas systems
FM-200 (HFC-227ea) and Novec 1230 systems for data centres, archives and control rooms.
CO2 systems
High pressure CO2 for generator rooms, turbines, transformers and unoccupied spaces.
Inert gas systems
IG-541, IG-55 and nitrogen systems that leave no residue.
Foam systems
Foam proportioners, bladder tanks, foam makers, pourers and AFFF / AR-AFFF concentrates for tanks and loading bays.
Dry powder systems
Fixed powder systems for flammable liquid and gas risks.
Sprinkler systems
Wet, dry and pre-action systems with alarm valves, sprinkler heads and flow switches.
Deluge and water spray
Deluge valves and open nozzles for transformers, vessels and pipe racks.
Water mist systems
High pressure mist for machinery spaces, turbines and heritage buildings.
Kitchen wet chemical systems
Hood and duct systems for restaurants, hotels and hospital kitchens.
Pre-engineered and tube systems
Automatic units for electrical panels, CNC machines and engine bays.
Room integrity testing
Door fan testing to prove the room holds the agent for the required time.
Refill and recertification
Cylinder weighing, refilling, valve service and system recertification.
What we do with every order
- Free site survey and equipment recommendation
- Supply of new, certified equipment with datasheets and certificates of conformity
- Installation and commissioning by qualified engineers
- Inspection, testing and preventive maintenance contracts
- Refilling, servicing and hydrostatic testing
- Documentation for Iraqi Civil Defence approval
- Hands-on training for your staff on every item we supply
- Spare parts and after-sales support across Iraq
Standards we work to
| Standard | What it covers |
|---|---|
| NFPA 2001 | Clean agent extinguishing systems |
| NFPA 12 | Carbon dioxide systems |
| NFPA 11 | Low, medium and high expansion foam |
| NFPA 13 / NFPA 15 | Sprinklers and water spray |
| NFPA 750 | Water mist systems |
| NFPA 17A | Wet chemical systems |
Brands we supply
System components and agents from recognised suppression manufacturers, selected for approvals, availability of spare parts and long-term service in Iraq.
Quality World is an independent supplier. We are not the authorised agent, distributor or exclusive representative of any brand listed on this page. Brand names and trademarks belong to their owners. We source genuine products through approved supply channels, and availability, origin and certificates are confirmed in writing with every quotation.
Supply and service across Iraq
We deliver to Basra, Baghdad, Erbil, Sulaymaniyah, Duhok, Kirkuk, Mosul, Najaf, Karbala, Hilla, Nasiriyah, Amarah, Kut, Diwaniyah, Samawah, Ramadi, Fallujah, Tikrit and Baqubah, and to oil fields, refineries, power stations, ports, hospitals, schools, malls, factories and construction sites across Iraq. Our engineers can visit your site to survey, measure and recommend the right equipment before you buy.
Frequently asked questions
Which gas is best for a server room?
Clean agents such as FM-200 or Novec 1230 are common because they are safe for occupied rooms and leave no residue. We recommend after a site survey.
Do you maintain systems you did not install?
Yes. We inspect, test and service existing systems and report what needs repair.
Can you do a room integrity test?
Yes, we test the room enclosure and give a report on hold time and leakage.