Lifting, Pressure and Height Safety Inspection in Iraq

Thorough examination, load testing and certification of cranes, lifting gear, heavy equipment, pressure systems, height safety equipment, scaffolds, fire systems and gas detectors. Approved by Basrah Gas Company for engineering inspection, heavy equipment and lifting operations, and registered with Basra Oil Company (1378) and North Oil Company (412).

Inspection intervals

How often should your equipment be examined?

These are the intervals recognised as good practice internationally (LOLER and PUWER in the UK, LEEA guidance, EN 365, NFPA and manufacturers’ instructions). Your operator’s rules, Iraqi regulations or the equipment manufacturer may ask for shorter intervals, and those always come first. A competent person should also examine equipment after installation, after major repair and after any event that could affect its safety.

EquipmentTypical intervalWhat we do
Equipment that lifts people (man baskets, MEWPs, personnel hoists)Every 6 monthsThorough examination, function tests, certificate and colour tag
Lifting accessories (slings, shackles, hooks, chain blocks, spreader beams, eyebolts)Every 6 monthsVisual and dimensional checks, load testing where needed, register update
Other lifting equipment (cranes, hoists, winches, lifting frames)Every 12 months, or by a written scheme of examinationThorough examination, load test to 500 t, NDT of critical parts
Forklifts, side booms, loaders, excavators, HIAB, trailers and tankersEvery 12 months for the lifting parts, plus pre-use checks every shiftThird-party inspection to client and operator checklists, defect reports
Pressure systems, relief valves, gauges and transmittersAs set in the written scheme or calibration plan, commonly 12 monthsCalibration, bench testing of relief valves, hydrostatic and pneumatic tests
Harnesses, lanyards and lifelinesDetailed inspection at least every 12 months, every 6 months under heavy use, and before every use by the userInspection against EN 365 and the maker’s instructions, removal of failed items
ScaffoldsBefore first use, at least every 7 days, and after bad weather or alterationInspection, scaff-tag system, inspection register
OCTG, drill pipe and BHAPer API, DS-1 category and client specificationVisual, EMI, UT and MPI inspection, thread gauging, before and after repair reports
Fire extinguishers and fire pumpsMonthly visual checks, annual maintenance, weekly and annual pump tests (NFPA 10 and NFPA 25)Inspection, testing and maintenance contracts to Civil Defence standards
Portable gas detectorsBump test before daily use, calibration typically monthly or per manufacturerCalibration with certified gas, certificates for every unit

This table is general guidance only and does not replace your legal or contractual duties. Ask us for an inspection plan for your exact equipment.

What you receive

Clear reports your client will accept

  • Inspection report listing every item that passed
  • Before-repair report showing defects and the repairs needed
  • After-repair report once items are re-inspected
  • Certificates of thorough examination and load test
  • Colour coding and tags on site
  • An equipment register with the next due date for every item
Where we work

Basra headquarters, field teams across Iraq

Our inspectors work from Basra across the southern oil fields, including Rumaila, Zubair and Gharraf, and travel nationwide for operators such as North Oil Company and for contractors of the international oil companies.